NTPC curb NTPC was incorporated in 1975. In the last 32 years, it has full-grown into the largest designer returns of India. NTPC is the Sixth largest thermal power informant in the World and the Second most efficient utility in terms of capacity utilisation ground on data of 1998. A public sector company, it was incorporated in the year 1975 to accelerate power development in the dry land as a wholly owned company of the political relation of India. At present, Government of India holds 89.5% share. NTPCs share on 31 Mar 2007 in the positive installed capacity of the country was 20.18% and it contributed 28.50% of the total power generation of the country during 2006-07. NTPC Limited, has been ranked top awardee for MoU portion out for Excellence in Performance, instituted by DPE, consecutively for two years, 2004-05 and 2005-06 with Excellent rating. NTPC Limited has initiated the concept of electrification of remote villages by setting up Distributed generation projects and demonstrating a sustainable business model leading to interconnected growth of villages for achieving the goal of Electricity for all. NTPC delivers power at minimal environment cost, and achieves it. NTPCs core business is engineering, mental synthesis and operation of power generating plants.

It also provides consultancy in the area of power plant constructions and power generation to companies in India and abroad. As on date the installed capacity of NTPC is 27,904 MW through its 15 coal based (22,895 MW), 7 gas based (3,955 MW) and 4 Joint casualty Projects (1,054 MW). NTPC acquired 50% equity of the SAIL Power Supply mass Ltd. (SPSCL). This JV company operates the captive power plants of Durgapur (120 MW), Rourkela (120 MW) and Bhilai (74 MW). NTPC also has 28.33% second in Ratnagiri Gas & Power Private Limited (RGPPL) a joint venture company between NTPC, GAIL, Indian pecuniary Institutions and Maharashtra SEB Holding Co. Ltd. The present capacity of RGPPL is 740 MW Growth Plans The Indian power... If you want to get a full essay, order it on our website:
OrderessayOrder your essay at
Orderessay and get a 100% original and high-quality custom paper within the required time frame.
No comments:
Post a Comment